Drummond Street, London, NW1 3HP

January - December 2012

Adhesive used - Grabfast Roofing 17kg Canisters

Contractor - McMullen Architectural Systems Ltd

The building was lined with Giscosa EPDM rubber to form a damp proof membrane on the outside of the whole building an area of 3000 sq metres. Grabfast Roofing Adhesive was used to 100% bond the membrane directly onto the concrete underneath the cladding.